Retail, Salons & Storefronts
$775,000 (Reported)
Proposed new 7381 SF AutoZone retail store for auto parts and products. — Prime early-stage window for Channel Letter Signage, Security Cameras & Access Control, Commercial Glass/Doors.
Retail, Salons & Storefronts
~$721,240 (Est. from 5,548 SF)
PARTIAL REMODEL OF EXISTING RETAIL TENANT SPACE IN THE DOMAIN II FOR A NEW TEMPORARY VICTORIA SECRETE STORE — Prime early-stage window for Channel Letter Signage, Security Cameras & Access Control, Commercial Glass/Doors.
Corporate & Suite Finish-Outs
~$910,680 (Est. from 7,589 SF)
Finish Out to Create Office for Suite 1301 — Prime early-stage window for Office Furniture & Cubicles, Low-Voltage/Fiber Cabling, Access Control.
Retail, Salons & Storefronts
~$1,776,840 (Est. from 13,668 SF)
The Existing 1- Story Retail Structure Is Being Modified to Add 2 Additional Stories of Leasable Office Space above. 3 Stories Total 2024 023039 DA... — Prime early-stage window for Channel Letter Signage, Security Cameras & Access Control, Commercial Glass/Doors.
Restaurants, Bars & Hospitality
~$647,500 (Est. from 3,500 SF)
ePlan: Commercial Expedited Review - Change of Use from Retail to Restaurant Scope of work to Include Addition of Grease Trap (12000SF). — Prime early-stage window for POS & Merchant Services, Commercial Hood/Grease Trap, Signage & Menus.
Restaurants, Bars & Hospitality
~$236,615 (Est. from 1,279 SF)
INTERIOR REMODEL/FINISH OUT: DEMO OF EXST ADMIN OFFICES FOR NEW YOGA STUDIO ROOM WITH ADDITION OF SMALL FOOD PREP AREA NEAR RECEPTION. — Prime early-stage window for POS & Merchant Services, Commercial Hood/Grease Trap, Signage & Menus.
Industrial, Warehouse & Tech
$1,932,661 (Reported)
Remodel of Gate 13 to Construct a New Covered Walkway and Canopy For a New Bus Loop to Concourse M (3371 SF). — Prime early-stage window for Commercial HVAC & Electrical, Industrial Epoxy/Safety Striping, Pallet Racking.
Industrial, Warehouse & Tech
~$1,815,000 (Est. from 16,500 SF)
MEP Systems Upgrade and Expansion along with replacement of existing server racks and associated equipment. — Prime early-stage window for Commercial HVAC & Electrical, Industrial Epoxy/Safety Striping, Pallet Racking.
Corporate & Suite Finish-Outs
$228,000 (Reported)
This project consists of removing the existing roofing assembly and installing a new code compliant TPO roofing system — Prime early-stage window for Office Furniture & Cubicles, Low-Voltage/Fiber Cabling, Access Control.
Industrial, Warehouse & Tech
$60,000,000 (Reported)
New Construction of New Six Gate Satellite Concourse at ABIA (38224 SF). — Prime early-stage window for Commercial HVAC & Electrical, Industrial Epoxy/Safety Striping, Pallet Racking.
Retail, Salons & Storefronts
~$2,714,140 (Est. from 20,878 SF)
ePlan: Commercial Expedited Review - Interior Remodel and Change of Use from Retail to Indoor Recreation Center (33878 SF). — Prime early-stage window for Channel Letter Signage, Security Cameras & Access Control, Commercial Glass/Doors.
Restaurants, Bars & Hospitality
~$2,451,805 (Est. from 13,253 SF)
Interior Non-Structural Demolition — Prime early-stage window for POS & Merchant Services, Commercial Hood/Grease Trap, Signage & Menus.
Retail, Salons & Storefronts
~$789,360 (Est. from 6,072 SF)
ePlan: Commercial Expedited Review - Interior Remodel to Existing Office space. — Prime early-stage window for Channel Letter Signage, Security Cameras & Access Control, Commercial Glass/Doors.
Retail, Salons & Storefronts
~$652,990 (Est. from 5,023 SF)
EXISTING SPACE NEW TENANT TO INCLUDE NEW WALLS FINISHES FIXTURES AND PAINT. — Prime early-stage window for Channel Letter Signage, Security Cameras & Access Control, Commercial Glass/Doors.
Retail, Salons & Storefronts
~$551,980 (Est. from 4,246 SF)
ePlan: Commercial Expedited Review - Interior Remodel to Existing Office space. — Prime early-stage window for Channel Letter Signage, Security Cameras & Access Control, Commercial Glass/Doors.
Retail, Salons & Storefronts
~$485,680 (Est. from 3,736 SF)
ePlan: Commercial Expedited Review - Interior Remodel to Existing Retail Store (3736 SF). — Prime early-stage window for Channel Letter Signage, Security Cameras & Access Control, Commercial Glass/Doors.
Retail, Salons & Storefronts
~$462,800 (Est. from 3,560 SF)
ePlan: Commercial Expedited Review - Interior Remodel to Existing Office space. — Prime early-stage window for Channel Letter Signage, Security Cameras & Access Control, Commercial Glass/Doors.
Retail, Salons & Storefronts
~$344,500 (Est. from 2,650 SF)
Interior remodel for fitness use on first floor 1. — Prime early-stage window for Channel Letter Signage, Security Cameras & Access Control, Commercial Glass/Doors.
Retail, Salons & Storefronts
~$195,650 (Est. from 1,505 SF)
ePlan: Commercial Expedited Review - Interior Remodel to Existing Office space to Create 17th Floor Pantry and Wellness Suites. — Prime early-stage window for Channel Letter Signage, Security Cameras & Access Control, Commercial Glass/Doors.
Corporate & Suite Finish-Outs
~$3,840,000 (Est. from 32,000 SF)
Existing racking permitting — Prime early-stage window for Office Furniture & Cubicles, Low-Voltage/Fiber Cabling, Access Control.
Corporate & Suite Finish-Outs
~$1,701,360 (Est. from 14,178 SF)
Interior non-structural demo — Prime early-stage window for Office Furniture & Cubicles, Low-Voltage/Fiber Cabling, Access Control.
Corporate & Suite Finish-Outs
~$192,000 (Est. from 1,600 SF)
Demo remodel of the current existing outdoor swimming pool on floor 11 of 44 East Avenue for multi family use — Prime early-stage window for Office Furniture & Cubicles, Low-Voltage/Fiber Cabling, Access Control.
Corporate & Suite Finish-Outs
~$4,634,760 (Est. from 38,623 SF)
ePlan: Commercial Expedited Review - First Time Finish Out for The Twelve Thirty Club (38623 SF). Building Permit - Permit AddCycle tab Building Permit... — Prime early-stage window for Office Furniture & Cubicles, Low-Voltage/Fiber Cabling, Access Control.
Corporate & Suite Finish-Outs
~$220,080 (Est. from 1,834 SF)
Rooftop Solar. Rooftop Solar BackFed Breaker Interconnection. 2026-125643 DA. — Prime early-stage window for Office Furniture & Cubicles, Low-Voltage/Fiber Cabling, Access Control.
Retail, Salons & Storefronts
$4,000,000 (Reported)
ePlan: Expedited Review - New Construction accessory Dumpster Enclosure (270 sf.) — Prime early-stage window for Channel Letter Signage, Security Cameras & Access Control, Commercial Glass/Doors.
Restaurants, Bars & Hospitality
$4,000,000 (Reported)
new construction of a new hotel — Prime early-stage window for POS & Merchant Services, Commercial Hood/Grease Trap, Signage & Menus.
Restaurants, Bars & Hospitality
~$888,000 (Est. from 4,800 SF)
Localized fire damage repair to existing roof. Scope includes repair/replacement of affected steel bar joists replacement of damaged metal roof decking... — Prime early-stage window for POS & Merchant Services, Commercial Hood/Grease Trap, Signage & Menus.
Retail, Salons & Storefronts
~$562,250 (Est. from 4,325 SF)
4325 SF Commercial Lease Space Build-Out for Nail Salon. — Prime early-stage window for Channel Letter Signage, Security Cameras & Access Control, Commercial Glass/Doors.
Retail, Salons & Storefronts
$275,000 (Reported)
New Construction for Cantina for COTAland. — Prime early-stage window for Channel Letter Signage, Security Cameras & Access Control, Commercial Glass/Doors.
Restaurants, Bars & Hospitality
~$244,200 (Est. from 1,320 SF)
Subdivide open area into 4 offices with a corridor an AV training room and the rest of the space will remain an open area. 2026-138526 DA. — Prime early-stage window for POS & Merchant Services, Commercial Hood/Grease Trap, Signage & Menus.
Retail, Salons & Storefronts
$100,750 (Reported)
Installation of 4 playground shades. SP-2024-0112CX — Prime early-stage window for Channel Letter Signage, Security Cameras & Access Control, Commercial Glass/Doors.
Industrial, Warehouse & Tech
$170,000 (Reported)
This permit application specifically pertains to the installation of the soccer minipitch and lighting system. The frame is entirely metal in... — Prime early-stage window for Commercial HVAC & Electrical, Industrial Epoxy/Safety Striping, Pallet Racking.
Corporate & Suite Finish-Outs
~$5,868,960 (Est. from 48,908 SF)
Interior non structural demolition — Prime early-stage window for Office Furniture & Cubicles, Low-Voltage/Fiber Cabling, Access Control.
Restaurants, Bars & Hospitality
~$680,060 (Est. from 3,676 SF)
ePlan: Commercial Expedited Review - Interior Remodel and Change of Use from Storage to Cocktail Lounge (3676 SF) — Prime early-stage window for POS & Merchant Services, Commercial Hood/Grease Trap, Signage & Menus.
Retail, Salons & Storefronts
~$165,360 (Est. from 1,272 SF)
Interior remodel to crate pilates studio. 2026-113312 DA. — Prime early-stage window for Channel Letter Signage, Security Cameras & Access Control, Commercial Glass/Doors.